CSR 3211 Epoxy Flex Floor Coating

Send Message Add to My Favorites

Description

2-component coating composed of a mixture of epoxy resin with special additives and hardener. Each set contains two packs weighed at the factory. It is a floor coating with high mechanical resistance which is not affected by chemical substances and can be easily cleaned. The coating with various colors, is ideal for use at pharmacy factories, sterile areas of hospitals, power plants and any kind of industrial plants, at covering active cracks on the roof together with glass fiber textile. It is recommended for water insulation at terraces


Supplier

Digalpa


Product Category

Paintings & Coatings

Coatings

Floor Coatings


Application Tools

  • Toothed trowel
  • Paint roller
  • Hedgehog roller

Chemical Resistance?

  • Yes

Colors Available

  • Various

Consumption with Roller for 1 Layer [g/m²]

  • 500 <--> 900

Consumption with Trowel for 1 Layer [g/m²]

  • 500 <--> 900

Density of Component A (ASTM D-1475) [g/cm³]

  • 1,42

Density of Component B (ASTM D-1475) [g/cm³]

  • 1,11

Minimum Application Temperature [°C]

  • 5ºC

Mixture Density (ASTM D-1475) [g/cm³]

  • 1,26

Mixture Rate A:B (by Weight)

  • 1 : 1

Modulus of Elasticity [kg/cm²]

  • 45000

Pot Life in 10°C [minutes]

  • 720

Pot Life in 20°C [minutes]

  • 240

Pot Life in 30°C [minutes]

  • 150

Pot Life in 40°C [minutes]

  • 100

Pressure Resistance [kg/cm²]

  • 250

Recommended for

  • Industrial plants
  • Hospitals' sterile areas
  • Power plants
  • Pharmacies
  • Covering active cracks
  • Roofing

Shelf Life in Storage Below 25°C (Months)

  • 12

Solvent-Free

  • Yes

Storage Temperature Interval [°C]

  • +5ºC <--> +25ºC

Tensile Strength [kg/cm²]

  • 125

Touchable-Drying Time in 10°C [Hours]

  • 120

Touchable-Drying Time in 20°C [Hours]

  • 72

Touchable-Drying Time in 30°C [Hours]

  • 48

Touchable-Drying Time in 40°C [Hours]

  • 6

Type of Chemical Substance

  • 2-component epoxy resin

Waiting Time Between Coats in 10ºC [Hours]

  • 40

Waiting Time Between Coats in 20ºC [Hours]

  • 10

Waiting Time Between Coats in 30ºC [Hours]

  • 4

Waiting Time for the Last Coat [days]

  • 2

Suppliers;

Register and
browse projects
to bid.

Buyers;

Register your
projects and get
quotes, auctions,
product point
combinations.